June 2007 Construction

Completed in June:
Exterior paint
Perimeter block wall
Interior molding
Interior and exterior doors
Heating and AC units
Cabinets and countertops
Lot retention

June 3rd, 2007: Digging the trench for the block perimeter wall foundation. This is where the south RV gate will be.

June 3rd, 2007: More of the same trench. This is next to the horse trail.

June 3rd, 2007: First glimpse of the paint. The paint is sort of a subdued peach/salmon color. After all of the exterior construction is done, the painters are going to hit it with "weathering" effects to make the paint look rustic.

June 3rd, 2007: Glass brick in the boys' jack-n-jill bathroom shower.

June 3rd, 2007: This is the garage workshop and the door leading into the house from the garage.

June 3rd, 2007: Storage area on the back wall of the garage. The tiny window in the storage closet overlooks the courtyard. The three arch windows on the east wall overlook the front driveway.

June 3rd, 2007: As the block perimeter wall goes up, the block frame for the front entry gate begins construction.

June 9th, 2007: The permieter block wall is completed. We still have to stucco the outside-facing part of the wall and paint to match the house. This is the perimeter wall that borders the horse trail.

June 9th, 2007: Inside perimeter wall. You can see here how far back it goes - I still don't know what I'm going to do with all the open  space. I'd like to make a desert botanical garden.

June 9th, 2007: One of three (I recounted and found FIVE AC units!) five air conditioning units. This is for the west end of the house. There is one on the north side for the casita, two on the south side for the common areas, and one in the basement.

June 9th, 2007: Exterior doors are installed. I also had a cat door cut in but it hasnt been installed yet.

June 9th, 2007: Interior doors and molding installed. The interior doors have an arch design to match the recurring arch features throughout the architecture.

June 9th, 2007: Closets are taking shape. All of the bedroom, laundry, and coat closets are shelved.

June 9th, 2007: These are the doors leading from the basement into the light well . The light well will have a ladder up to the back patio. I might put plants in the light well but havn't decided yet.

June 23rd, 2007: Due to city drainage requirements for each lot, I must have a "drainage retention" dug out on part of the lot. It's hard to see in the picture but they had to dig out and haul away a few tons of dirt - just about as much as digging a swimming pool would have required.

June 23rd, 2007: Cabinets get installed. These are the kitchen cabinets - the cabinets in other rooms in the house look very much the same. The wood is a distressed, knotty alder with flaws intact.



June 23rd, 2007: All of the tub frames and countertops are prepped for tile with backerboard (a compressed or concrete substrate that provides a more stable surface onto which tile can be installed). The choice of tile over granite (or some polymer countertop material) was to contribute to the rustic, Spanish Colonial look. This is the frame for the soaking tub in the master bathroom.

June 23rd, 2007: This is the bathroom sink in the casita, prepped for tile installation with backerboard.

June 30th, 2007: Interior paint and tile installation begin. This is the master bath - the tile is being installed in the shower, which you can only see part of in this picture. The color for the bathroom and master suite is a pale green.

June 30th, 2007: This is the boys' bathroom. The color of the bathroom, the boys' rooms, and their adjoining playroom is a pale lavender .. not a "boy" color but it looks good.

June 30th, 2007: View of the door from the casita leading out into the courtyard. The color here is a peach/salmon.


July Construction
Back to May ..